Guides
The paperwork side of running trade work: what to put on a document, how to price it, and how to get paid for it without chasing.
Change orders that actually get paid
Most unpaid extra work was agreed verbally, mid-job, by someone with their hands full. Here is the process that prevents it.
E-signatures on estimates: what they do and don't do
A typed or drawn signature on an estimate is normal practice for accepting a proposal. Here is what it is good for, and where it stops.
Estimate, quote or invoice — which one to send
The three documents do different jobs, and sending the wrong one is how contractors end up bound to a price they meant as a ballpark.
Free invoice generators that don't make you sign up
Five free invoicing tools compared on the thing that actually differs: whether you need an account, whether invoices are capped, and what happens to your data. Prices checked October 2026.
How to collect a deposit without losing the job
Deposits stop you financing someone else's project. Asking for one is a matter of what you tie it to and when you ask.
How to get paid faster
Most late payments are not customers refusing to pay. They are invoices sent late, missing a due date, or hard to act on.
How to price a job so the work is actually worth doing
Your hourly rate is not what you pay yourself. Here is how to build a number that covers overhead and leaves a margin, without guessing.
Quoting a panel upgrade when the utility controls your schedule
A service upgrade is three jobs: the load calculation, the work itself, and coordinating a utility and an inspector you do not control. How to price and sequence all three.
Quoting a roof replacement when the deck is a guess
Squares and pitch are the easy part. What decides whether a roof is profitable is the decking allowance, the layer count and who is really paying — the homeowner or their insurer.
Quoting a water heater replacement without eating the difference
The variables that decide whether a heater swap is a two-hour job or a two-day one — venting, code upgrades, access and permit — and how to put each on the quote before you find it.
Quoting an AC changeout when you have not been in the attic
Tonnage, refrigerant, ductwork and panel capacity decide an HVAC changeout price — and three of the four are hidden at the walkthrough. How to price what you can see and name what you cannot.
Scope and exclusions: the paragraph that prevents the argument
Nearly every dispute about trade work is a disagreement about what was included. Exclusions are cheaper than lawyers.
What actually belongs on a contractor invoice
The fields that get an invoice paid, the ones some states require, and the ones that quietly cost you money when they're missing.