Estimate templates by trade

An estimate is your best professional judgment of what a job will cost, given before the work starts.

Use an estimate when the scope is clear but the final number can still move — concealed damage, a substrate you cannot see until demo, or material prices that change between bid and start date.

Skip the templates: the free estimate generator opens the builder blank.

What every estimate needs

  • An expiry date, so a months-old number cannot be held against you
  • Scope written plainly enough that a homeowner knows what is excluded
  • A deposit or payment schedule if you need money before mobilising
  • A signature line, so acceptance is recorded rather than remembered

Choose your trade

Each one opens with its own line-item library already loaded.

Questions

Is an estimate legally binding?
Generally not, on its own — an estimate is an offer, and it usually becomes binding only once the customer accepts it and both sides act on it. What actually binds you is the language on the page: how you describe the scope, what you exclude, and whether you state that the price can change. This is general industry practice, not legal advice; if a job is large or unusual, have a lawyer look at your terms.
How long should an estimate stay valid?
Thirty days is the common default and it is short enough to protect you from material price swings. If you are quoting equipment with volatile pricing, shorten it — and say so on the page rather than in conversation.
Should I charge for estimates?
Many trades charge a diagnostic or assessment fee and credit it against the job if the customer proceeds. If you do, put it on the estimate as a line item with the credit spelled out, so it never reads as a surprise.