Flooring estimate template
An estimate is your best professional judgment of what a job will cost, given before the work starts. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 12 flooring line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the Flooring estimate template
The same sample document in two formats. The PDF is what a finished estimate looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this estimate filled in, in the builder — the same sample, editable.
Your Company Name
EstimateNo. EST-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Valid until Oct 1, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Materials | |||
| Luxury vinyl plank, 20 mil wear layer | 400 sq ft | $3.85 | $1,540.00 |
| Engineered hardwood, 7 in. wide plank | 400 sq ft | $7.20 | $2,880.00 |
| Porcelain tile, supplied | 400 sq ft | $4.60 | $1,840.00 |
| Underlayment and moisture barrier | 400 sq ft | $0.65 | $260.00 |
| Labor | |||
| Install, floating floor | 400 sq ft | $2.75 | $1,100.00 |
| Install, glue-down or nail-down | 400 sq ft | $3.90 | $1,560.00 |
| Demo and disposal of existing floor | 400 sq ft | $1.85 | $740.00 |
| Furniture moving and appliance disconnect | 6 hr | $85.00 | $510.00 |
| Subtotal | $10,430.00 | ||
| Tax (8.25%) | $537.90 | ||
| Total | $10,967.90 | ||
| Deposit due | $3,290.37 | ||
| Balance | $7,677.53 | ||
What a Flooring estimate needs on it
Flooring estimates go wrong below the surface. The material is easy to price per square foot; what moves the number is whether the subfloor is flat, whether the old floor comes up clean, and how many transitions and stair nosings the job actually has. Price levelling as a stated allowance, count the transitions on the estimate, and include the waste factor in writing so a customer is not surprised to be buying ten percent more material than their room measures.
Estimate any job over an unknown subfloor — anything with existing tile, adhesive-backed vinyl, or a slab you have not checked for moisture. Adhesive that will not release, a slab reading high on a moisture test, and joists that need sistering all change the number, and naming them keeps the change credible.
- Material by product name, wear layer and plank size — not "LVP"
- Subfloor preparation: levelling compound, flatness tolerance, and an allowance if unknown
- Waste factor as a stated percentage, and whether the customer keeps the offcuts
- Transitions, thresholds, stair nosings and quarter round, counted rather than assumed
- Whether furniture moving, appliance disconnect and old-floor disposal are included
- Acclimation time, because installing wood the day it arrives is how callbacks start
And what every estimate needs
Use an estimate when the scope is clear but the final number can still move — concealed damage, a substrate you cannot see until demo, or material prices that change between bid and start date.
- An expiry date, so a months-old number cannot be held against you
- Scope written plainly enough that a homeowner knows what is excluded
- A deposit or payment schedule if you need money before mobilising
- A signature line, so acceptance is recorded rather than remembered
Flooring line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Materials | ||
| Luxury vinyl plank, 20 mil wear layer | sq ft | $3.85 |
| Engineered hardwood, 7 in. wide plank | sq ft | $7.20 |
| Porcelain tile, supplied | sq ft | $4.60 |
| Underlayment and moisture barrier | sq ft | $0.65 |
| Self-levelling compound | bag | $42.00 |
| Transition strip or threshold | ea | $48.00 |
| Stair nosing, supplied and fitted | ea | $85.00 |
| Quarter round, installed and finished | ft | $4.75 |
| Labor | ||
| Install, floating floor | sq ft | $2.75 |
| Install, glue-down or nail-down | sq ft | $3.90 |
| Demo and disposal of existing floor | sq ft | $1.85 |
| Furniture moving and appliance disconnect | hr | $85.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
How flooring contractors price this work
Flooring prices per square foot for material and per square foot for labor, with adders for pattern layout, stairs and demolition. The reliably underpriced parts are subfloor prep and trim work, which is why experienced installers quote levelling as an allowance with a per-bag or per-square-foot rate rather than eyeballing it from a doorway.
Questions
- What waste factor should a flooring estimate use?
- Ten percent is the usual baseline for a straight lay, rising to fifteen or more for diagonal and herringbone patterns or rooms with many cuts. Put the percentage on the estimate. Customers who measure their own room and get a different number assume you are padding, and one line explaining waste prevents that entirely.
- How should I price subfloor levelling before I see it?
- As an allowance with a unit rate — for example, a set number of bags of levelling compound included, with a stated price per bag beyond it. It gives the customer a real number and it means an unexpectedly bad slab is arithmetic rather than a renegotiation.
- Who is responsible for moving furniture and appliances?
- Whoever the estimate says, which is why it should say. Furniture moving, appliance disconnect and reconnect, and toilet pulls for bathroom flooring are all real labor. Price them or exclude them by name; leaving it unstated means you will do it for free on install day.
- Is an estimate legally binding?
- Generally not, on its own — an estimate is an offer, and it usually becomes binding only once the customer accepts it and both sides act on it. What actually binds you is the language on the page: how you describe the scope, what you exclude, and whether you state that the price can change. This is general industry practice, not legal advice; if a job is large or unusual, have a lawyer look at your terms.
- How long should an estimate stay valid?
- Thirty days is the common default and it is short enough to protect you from material price swings. If you are quoting equipment with volatile pricing, shorten it — and say so on the page rather than in conversation.
- Should I charge for estimates?
- Many trades charge a diagnostic or assessment fee and credit it against the job if the customer proceeds. If you do, put it on the estimate as a line item with the credit spelled out, so it never reads as a surprise.
Build your Flooring estimate now
Opens with the Flooring line items already loaded. Everything stays in this browser.
Open the builder