Electrical quote template
A quote is a fixed price for a defined scope of work — the number does not move unless the scope does. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 11 electrical line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the Electrical quote template
The same sample document in two formats. The PDF is what a finished quote looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this quote filled in, in the builder — the same sample, editable.
Your Company Name
QuoteNo. QUO-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Valid until Oct 1, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Equipment | |||
| 200A panel upgrade, meter main combo | 1 ea | $2,850.00 | $2,850.00 |
| Level 2 EV charger circuit, 60A, up to 40 ft | 1 ea | $1,150.00 | $1,150.00 |
| Generator interlock kit, panel-mounted | 1 ea | $425.00 | $425.00 |
| Materials | |||
| Dedicated 20A circuit, up to 50 ft | 1 ea | $385.00 | $385.00 |
| Recessed LED can, supplied and installed | 1 ea | $145.00 | $145.00 |
| GFCI receptacle, replace and test | 1 ea | $95.00 | $95.00 |
| Labor | |||
| Ceiling fan, install on existing box | 1 ea | $185.00 | $185.00 |
| Load calculation and service assessment | 1 ea | $175.00 | $175.00 |
| Subtotal | $5,410.00 | ||
| Tax (8.25%) | $416.63 | ||
| Total | $5,826.63 | ||
| Deposit due | $1,747.99 | ||
| Balance | $4,078.64 | ||
What a Electrical quote needs on it
Electrical estimates carry a license number and a load story. Most residential jobs that get disputed were priced without checking whether the panel could take the load — an EV charger or a heat pump on a full 100-amp service is a panel upgrade wearing a small job's clothing. Say what the service is, say what the job needs, and the customer understands the number before you send an invoice for double it.
Device-level work quotes well: so many receptacles, so many fixtures, a known circuit run. Fix that price and keep the service and panel as a separate priced option, so a customer can accept the work you can guarantee without you gambling on what is inside the panel.
- Your license number, which several states require on the document itself
- Existing service size and available capacity — the basis for the whole price
- Code-required protection the job triggers: AFCI, GFCI, tamper-resistant devices
- Permit and inspection, separately from labor, since utility coordination adds days
- Whether drywall cut-in and patching is included, because running circuits means opening walls
And what every quote needs
Use a quote when you can see the whole job and control the variables: a like-for-like replacement, a measured area, a repeat job you have priced twenty times.
- A tightly written scope — a fixed price is only safe if the scope is exact
- Explicit exclusions, since anything unlisted is what a dispute will be about
- A change-order clause saying how additional work gets priced and approved
- An expiry date, because a fixed price cannot outlive your material costs
Electrical line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Equipment | ||
| 200A panel upgrade, meter main combo | ea | $2850.00 |
| Level 2 EV charger circuit, 60A, up to 40 ft | ea | $1150.00 |
| Generator interlock kit, panel-mounted | ea | $425.00 |
| Materials | ||
| Dedicated 20A circuit, up to 50 ft | ea | $385.00 |
| Recessed LED can, supplied and installed | ea | $145.00 |
| GFCI receptacle, replace and test | ea | $95.00 |
| AFCI breaker, code-required replacement | ea | $110.00 |
| Labor | ||
| Ceiling fan, install on existing box | ea | $185.00 |
| Load calculation and service assessment | ea | $175.00 |
| Troubleshooting, first hour | hr | $145.00 |
| Permit, inspection and utility coordination | ea | $325.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
How electricians price this work
Residential electrical is usually flat-rate per device or per circuit, with hourly used for troubleshooting and anything open-ended. Panel and service work is quoted as a job. The variable that moves an electrical price most is not labor — it is whether the existing service has capacity, so price the load calculation as its own step rather than absorbing it.
Questions
- Does my license number have to be on an electrical estimate?
- Several states require the license number on contracts and advertising, and some require it on estimates specifically. Requirements vary, so check your own board — but printing it costs nothing and it is one of the fastest credibility signals on the page.
- How do I price an EV charger installation?
- Price it in two parts: the circuit and the capacity. The run itself is predictable — cable, breaker, disconnect, labor by distance. Whether the existing service can carry a 48-amp continuous load is the part that decides whether this is a one-day job or a service upgrade, so quote the load calculation first and the install second.
- Should I charge for a diagnostic on electrical troubleshooting?
- Yes — troubleshooting is the work, not a preamble to it. Charge a stated diagnostic rate, put it on the estimate, and credit it against the repair if they proceed. Free diagnostics on electrical faults reward the customer who calls four electricians and hires none of them.
- What is the difference between a quote and an estimate?
- A quote is a fixed price you are committing to; an estimate is an informed projection that can move. In practice many customers use the words interchangeably, so the safer approach is to label the document clearly and let the terms on the page say which one you mean.
- Can I change a quote after the customer accepts it?
- Not for the scope you quoted — that is the point of quoting. You change the price by changing the scope, through a written change order the customer approves before the extra work happens. Verbal change orders are how contractors end up eating costs.
- How do I protect a fixed price against surprises?
- Exclusions and allowances. List what is not included, and where you cannot see behind a wall, quote an allowance with a stated unit rate for anything beyond it. That keeps the headline price fixed while pricing the unknown honestly.
Build your Electrical quote now
Opens with the Electrical line items already loaded. Everything stays in this browser.
Open the builder