Electrical invoice template
An invoice is the request for payment once the work is done — the document that actually gets you paid. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 11 electrical line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the Electrical invoice template
The same sample document in two formats. The PDF is what a finished invoice looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this invoice filled in, in the builder — the same sample, editable.
Your Company Name
InvoiceNo. INV-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Due Sep 15, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Equipment | |||
| 200A panel upgrade, meter main combo | 1 ea | $2,850.00 | $2,850.00 |
| Level 2 EV charger circuit, 60A, up to 40 ft | 1 ea | $1,150.00 | $1,150.00 |
| Generator interlock kit, panel-mounted | 1 ea | $425.00 | $425.00 |
| Materials | |||
| Dedicated 20A circuit, up to 50 ft | 1 ea | $385.00 | $385.00 |
| Recessed LED can, supplied and installed | 1 ea | $145.00 | $145.00 |
| GFCI receptacle, replace and test | 1 ea | $95.00 | $95.00 |
| Labor | |||
| Ceiling fan, install on existing box | 1 ea | $185.00 | $185.00 |
| Load calculation and service assessment | 1 ea | $175.00 | $175.00 |
| Subtotal | $5,410.00 | ||
| Tax (8.25%) | $416.63 | ||
| Total | $5,826.63 | ||
What a Electrical invoice needs on it
An electrical invoice should record the permit number and the inspection result alongside the work. It is the document a homeowner produces at resale to show the panel upgrade was permitted, and an unpermitted-looking invoice can cost them a sale years later.
- The inspection date, since a permit number on its own does not show the work passed
- Circuits and devices actually installed, against what was quoted
- Panel directory updated — note that you labelled it, because most electricians do not
- Your license number again, since the invoice is the document that gets filed and kept
- Deposit credited, balance due, and your payment terms
And what every invoice needs
Send it the day the work is finished. Invoices sent within 24 hours get paid materially faster than ones that go out at the end of the month.
- A due date, not just terms — "Net 14" means less to a homeowner than a date
- Any deposit already paid, credited on the page so the balance is unarguable
- Payment instructions the customer can act on without calling you
- The estimate number it came from, so the customer can reconcile the two
Electrical line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Equipment | ||
| 200A panel upgrade, meter main combo | ea | $2850.00 |
| Level 2 EV charger circuit, 60A, up to 40 ft | ea | $1150.00 |
| Generator interlock kit, panel-mounted | ea | $425.00 |
| Materials | ||
| Dedicated 20A circuit, up to 50 ft | ea | $385.00 |
| Recessed LED can, supplied and installed | ea | $145.00 |
| GFCI receptacle, replace and test | ea | $95.00 |
| AFCI breaker, code-required replacement | ea | $110.00 |
| Labor | ||
| Ceiling fan, install on existing box | ea | $185.00 |
| Load calculation and service assessment | ea | $175.00 |
| Troubleshooting, first hour | hr | $145.00 |
| Permit, inspection and utility coordination | ea | $325.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
Questions
- Why should an electrical invoice record the permit number?
- Because it is the document a homeowner produces at resale to show the panel upgrade was permitted. An unpermitted-looking invoice can cost them a sale years later, and the inspection result beside it is what closes the question for good.
- Should I note that I labelled the panel directory?
- It is worth a line. Updating the directory is the part most electricians skip, the homeowner notices it the first time they need to kill a circuit, and it is a small piece of evidence that the job was finished rather than merely completed.
- When should I invoice electrical work that is waiting on inspection?
- Invoice at completion and note the inspection as scheduled or pending. The work is energised and in use; waiting on an inspector's calendar to get paid for finished work is a cash-flow decision you are making on the municipality's behalf.
Build your Electrical invoice now
Opens with the Electrical line items already loaded. Everything stays in this browser.
Open the builder