General contracting invoice template
An invoice is the request for payment once the work is done — the document that actually gets you paid. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 11 general contracting line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the General contracting invoice template
The same sample document in two formats. The PDF is what a finished invoice looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this invoice filled in, in the builder — the same sample, editable.
Your Company Name
InvoiceNo. INV-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Due Sep 15, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Labor | |||
| Demolition and debris removal | 2 day | $1,450.00 | $2,900.00 |
| Framing, carpenter crew | 6 hr | $95.00 | $570.00 |
| Project management and scheduling | 2 day | $650.00 | $1,300.00 |
| Materials | |||
| Dumpster, 20 yd, delivery and haul-off | 1 ea | $685.00 | $685.00 |
| Lumber and fasteners package | 1 ea | $2,850.00 | $2,850.00 |
| Allowances | |||
| ALLOWANCE — tile and setting materials | 1 ea | $3,500.00 | $3,500.00 |
| ALLOWANCE — plumbing fixtures and trim | 1 ea | $2,800.00 | $2,800.00 |
| ALLOWANCE — lighting and electrical devices | 1 ea | $1,600.00 | $1,600.00 |
| Subtotal | $16,205.00 | ||
| Tax (8.25%) | $943.39 | ||
| Total | $17,148.39 | ||
What a General contracting invoice needs on it
On a remodel, invoice against the draw schedule and show the running position: contract total, previously billed, this draw, remaining. Clients approve progress payments much faster when the invoice reconciles itself, and it is also the record that settles a dispute about what was already paid.
- Lien waivers for the subs paid out of the last draw, which is what protects the client title
- Which milestone this draw is against, so the client is paying for something they can see
- Allowances reconciled — selected, actual, over or under — rather than absorbed into the total
- Change orders by number, each with its own price, so they are not mistaken for cost creep
- Retainage held or released, and the balance due with your payment terms
And what every invoice needs
Send it the day the work is finished. Invoices sent within 24 hours get paid materially faster than ones that go out at the end of the month.
- A due date, not just terms — "Net 14" means less to a homeowner than a date
- Any deposit already paid, credited on the page so the balance is unarguable
- Payment instructions the customer can act on without calling you
- The estimate number it came from, so the customer can reconcile the two
General contracting line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Labor | ||
| Demolition and debris removal | day | $1450.00 |
| Framing, carpenter crew | hr | $95.00 |
| Project management and scheduling | day | $650.00 |
| Building permit and plan review | ea | $1250.00 |
| Overhead and profit | ea | $0.00 |
| Materials | ||
| Dumpster, 20 yd, delivery and haul-off | ea | $685.00 |
| Lumber and fasteners package | ea | $2850.00 |
| Allowances | ||
| ALLOWANCE — tile and setting materials | ea | $3500.00 |
| ALLOWANCE — plumbing fixtures and trim | ea | $2800.00 |
| ALLOWANCE — lighting and electrical devices | ea | $1600.00 |
| ALLOWANCE — cabinetry and countertops | ea | $9500.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
Questions
- How should a remodel invoice be structured?
- Against the draw schedule, showing the running position: contract total, previously billed, this draw, remaining. Clients approve progress payments much faster when the invoice reconciles itself, and it is also the record that settles a dispute about what was already paid — which on a six-month job is a real risk.
- How do I invoice allowance overages without an argument?
- Show the allowance, the actual cost and the difference, per category. "Tile allowance $3,000; selected $4,150; difference $1,150" is a client's own decision reflected back at them. The same money inside a larger total looks like a contractor's decision, and gets treated as one.
- Should change orders appear on the invoice separately?
- By number, each with its own price. A change order folded into the next draw looks like cost creep even when the client signed it, and separating them preserves the thing you built the process for: a visible record that every extra was priced and approved before the work happened.
Build your General contracting invoice now
Opens with the General contracting line items already loaded. Everything stays in this browser.
Open the builder