Concrete invoice template
An invoice is the request for payment once the work is done — the document that actually gets you paid. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 12 concrete line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the Concrete invoice template
The same sample document in two formats. The PDF is what a finished invoice looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this invoice filled in, in the builder — the same sample, editable.
Your Company Name
InvoiceNo. INV-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Due Sep 15, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Materials | |||
| Ready-mix concrete, 4000 PSI, fibre-reinforced | 8 cu yd | $215.00 | $1,720.00 |
| Rebar, #4 at 18 in. on center | 400 sq ft | $1.35 | $540.00 |
| Compacted gravel base, 4 in. | 400 sq ft | $1.85 | $740.00 |
| Vapour barrier, 10 mil | 400 sq ft | $0.55 | $220.00 |
| Labor | |||
| Excavation and grading | 400 sq ft | $2.60 | $1,040.00 |
| Forming and stripping | 40 ft | $9.75 | $390.00 |
| Place and finish, broom finish | 400 sq ft | $3.40 | $1,360.00 |
| Stamped and colored finish, adder | 400 sq ft | $6.25 | $2,500.00 |
| Subtotal | $8,510.00 | ||
| Tax (8.25%) | $265.65 | ||
| Total | $8,775.65 | ||
What a Concrete invoice needs on it
Concrete estimates are decided before the truck arrives. The pour itself is predictable; the excavation, base preparation and forming are where the hours go, and a bid that shows only cubic yards is hiding two-thirds of the job. State the PSI and the finish, price the base and forming as their own lines, and note that cure time is not a delay — it is the schedule.
A concrete invoice should record the mix delivered and the actual yardage, ideally against the batch ticket. It settles any question about what was poured, and on structural work it is the record an engineer or inspector will ask for.
- Volume in cubic yards, with the slab thickness it assumes
- Mix design: PSI, fibre or admixtures, and air entrainment in freeze-thaw climates
- Reinforcement — rebar size and spacing, or mesh — since "reinforced" covers both and they differ
- Base preparation: excavation depth, compacted gravel, and spoil removal
- Forming and stripping as separate labor from the pour
- Finish: broom, trowel, exposed aggregate or stamped, and any sealer
- Control joints, their spacing, and a plain note that concrete cracks
And what every invoice needs
Send it the day the work is finished. Invoices sent within 24 hours get paid materially faster than ones that go out at the end of the month.
- A due date, not just terms — "Net 14" means less to a homeowner than a date
- Any deposit already paid, credited on the page so the balance is unarguable
- Payment instructions the customer can act on without calling you
- The estimate number it came from, so the customer can reconcile the two
Concrete line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Materials | ||
| Ready-mix concrete, 4000 PSI, fibre-reinforced | cu yd | $215.00 |
| Rebar, #4 at 18 in. on center | sq ft | $1.35 |
| Compacted gravel base, 4 in. | sq ft | $1.85 |
| Vapour barrier, 10 mil | sq ft | $0.55 |
| Expansion joint and sealant | ft | $4.20 |
| Penetrating sealer, applied | sq ft | $0.95 |
| Labor | ||
| Excavation and grading | sq ft | $2.60 |
| Forming and stripping | ft | $9.75 |
| Place and finish, broom finish | sq ft | $3.40 |
| Stamped and colored finish, adder | sq ft | $6.25 |
| Concrete pump truck | ea | $985.00 |
| Spoil removal and haul-off | ea | $540.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
How concrete contractors price this work
Flatwork prices per square foot at a stated thickness, with the mix bought by the yard. Excavation, base and forming are usually more than half the labor, and access is the biggest single variable — a pour a truck can reach directly and one that needs a pump or wheelbarrows are different jobs at the same square footage. Price the pump, or price the barrows, but do not absorb either.
Questions
- What should a concrete estimate say about cracking?
- That it will. Concrete cracks; control joints decide where. Put a plain line on the estimate stating that hairline and control-joint cracking is normal and not a defect, alongside your joint spacing. It is the single most useful sentence you can print, because otherwise the first hairline crack becomes a warranty call.
- Should excavation be separate from the pour?
- Yes. Excavation, base and forming often exceed the cost of the concrete itself, and a bid showing one number per square foot invites comparison against someone who assumed a flat, clear site. Separate lines make your bid legible and make an over-excavation conversation straightforward.
- How do I price a pour the truck cannot reach?
- As a named line: pump truck, or additional labor for wheelbarrow placement. Access is the largest hidden variable in flatwork pricing. Note the access assumption on the estimate so that discovering a gate too narrow for a chute is a priced change rather than a loss.
- What has to be on an invoice?
- At minimum: your business name and contact details, the customer, an invoice number, the date, an itemised description of what was done, the amount due, and how to pay. Trades that carry a license usually put the license number on it too, and in some jurisdictions that is required.
- How soon should I invoice after finishing a job?
- Same day where you can. The gap between finishing and invoicing is the single easiest lever on how fast you get paid, and it costs nothing to close.
- Can I charge a late fee?
- Usually, if you stated it before the work — commonly 1 to 1.5% per month. It has to be on the estimate or your terms, not introduced for the first time on an overdue invoice, and some states cap the rate. Check your own state before relying on it.
Build your Concrete invoice now
Opens with the Concrete line items already loaded. Everything stays in this browser.
Open the builder