Drywall quote template

A quote is a fixed price for a defined scope of work — the number does not move unless the scope does. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 12 drywall line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.

Download the Drywall quote template

The same sample document in two formats. The PDF is what a finished quote looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.

No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.

See this quote filled in, in the builder — the same sample, editable.

Your Company Name

QuoteNo. QUO-1001

Bill to

Client Name

456 Client Street · Their City, ST 00000

Date Sep 1, 2026

Valid until Oct 1, 2026

Line items and totals of the sample Drywall quote
DescriptionQtyRateAmount
Materials
Drywall, 1/2 in., hung and fastened400 sq ft$1.15$460.00
Moisture-resistant board, wet areas400 sq ft$1.65$660.00
Joint compound, tape and corner bead400 sq ft$0.45$180.00
Primer, drywall sealer5 gal$48.00$240.00
Labor
Tape and finish to Level 4400 sq ft$1.95$780.00
Skim coat to Level 5, adder400 sq ft$1.40$560.00
Knockdown texture, sprayed400 sq ft$0.85$340.00
Orange-peel texture, sprayed400 sq ft$0.75$300.00
Subtotal$3,520.00
Tax (8.25%)$127.05
Total$3,647.05
Deposit due$1,094.12
Balance$2,552.93
The sample Drywall quote in the PDF and spreadsheet above. Figures are placeholders — everything is editable.

What a Drywall quote needs on it

Drywall bids hinge on a number most customers have never heard of: the finish level. Level 3 is fine behind texture and looks terrible under a flat sheen; Level 5 costs substantially more and is what you need for raking light. Put the level on the estimate, name the texture, and on repairs be explicit that matching existing texture is an attempt rather than a guarantee — because that is the callback that costs the most to argue about.

New construction and full-room work quote cleanly by the square foot at a stated finish level. Fix that price and exclude texture matching to adjacent existing surfaces — a fixed price on a match you cannot control is a callback waiting to happen.

  • Finish level (3, 4 or 5) with a plain-language note on what each means
  • Texture type by name — knockdown, orange peel, skip trowel, or smooth
  • Whether priming is included, since Level 5 effectively requires it
  • On repairs: that texture and paint matching is best-effort, not guaranteed
  • Dust control and containment, and whether the customer expects a clean house
  • Corner bead type, and whether existing walls are square enough for it

And what every quote needs

Use a quote when you can see the whole job and control the variables: a like-for-like replacement, a measured area, a repeat job you have priced twenty times.

  • A tightly written scope — a fixed price is only safe if the scope is exact
  • Explicit exclusions, since anything unlisted is what a dispute will be about
  • A change-order clause saying how additional work gets priced and approved
  • An expiry date, because a fixed price cannot outlive your material costs

Drywall line items included in this template

These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.

Starter line items for a Drywall quote
ItemUnitTypical rate
Materials
Drywall, 1/2 in., hung and fastenedsq ft$1.15
Moisture-resistant board, wet areassq ft$1.65
Joint compound, tape and corner beadsq ft$0.45
Primer, drywall sealergal$48.00
Labor
Tape and finish to Level 4sq ft$1.95
Skim coat to Level 5, addersq ft$1.40
Knockdown texture, sprayedsq ft$0.85
Orange-peel texture, sprayedsq ft$0.75
Patch repair, minimum charge (multi-visit)ea$385.00
Water-damage cut-out and replacementsq ft$6.50
Dust containment and site protectionea$165.00
Debris removal and cleanupea$245.00

Rates are illustrative US figures and vary widely by market. Price your own work.

How drywall contractors price this work

New work prices per square foot of board hung, taped and finished, with the finish level as the main multiplier. Repairs price by the patch or by the hour, and small patches are expensive per square foot because mobilisation, multiple coats and return trips dominate. Charging a minimum for repair calls is standard — three coats with dry time is a three-visit job whether the hole is a foot wide or a room is.

Questions

What drywall finish level should I quote?
Level 4 is the residential default under texture or flat paint. Level 5 — a skim coat over the whole surface — is what you need for gloss, dark colors or walls in raking light, and it costs meaningfully more. Put the level on the estimate: it is the difference between a fair bid and a cheap one, and it is invisible until the paint is on.
Can you guarantee a texture match on a repair?
Not honestly. Texture is applied by hand and ages with the paint, so a patch can be very close and still visible in the right light. Say so on the estimate, and offer the alternative — retexturing the full wall or to the nearest corner — as a priced option. Customers accept this readily when told beforehand.
Why is a small drywall repair so expensive per square foot?
Because the cost is trips, not area. Tape, two or three coats and texture each need dry time, so a one-foot patch and a full wall can both be three visits. A stated minimum charge on the estimate makes that legible rather than looking like padding.
What is the difference between a quote and an estimate?
A quote is a fixed price you are committing to; an estimate is an informed projection that can move. In practice many customers use the words interchangeably, so the safer approach is to label the document clearly and let the terms on the page say which one you mean.
Can I change a quote after the customer accepts it?
Not for the scope you quoted — that is the point of quoting. You change the price by changing the scope, through a written change order the customer approves before the extra work happens. Verbal change orders are how contractors end up eating costs.
How do I protect a fixed price against surprises?
Exclusions and allowances. List what is not included, and where you cannot see behind a wall, quote an allowance with a stated unit rate for anything beyond it. That keeps the headline price fixed while pricing the unknown honestly.