Roofing invoice template
An invoice is the request for payment once the work is done — the document that actually gets you paid. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 12 roofing line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the Roofing invoice template
The same sample document in two formats. The PDF is what a finished invoice looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this invoice filled in, in the builder — the same sample, editable.
Your Company Name
InvoiceNo. INV-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Due Sep 15, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Materials | |||
| Architectural shingles, supplied and installed | 24 sq | $485.00 | $11,640.00 |
| Synthetic underlayment | 24 sq | $58.00 | $1,392.00 |
| Ice-and-water shield, eaves and valleys | 24 sq | $145.00 | $3,480.00 |
| Ridge vent, cut and install | 40 ft | $18.50 | $740.00 |
| Labor | |||
| Tear-off and disposal, first layer | 24 sq | $115.00 | $2,760.00 |
| Tear-off, each additional layer | 24 sq | $75.00 | $1,800.00 |
| Steep-pitch adder (8/12 and above) | 24 sq | $85.00 | $2,040.00 |
| Dumpster, delivery, haul-off and magnet sweep | 1 ea | $685.00 | $685.00 |
| Subtotal | $24,537.00 | ||
| Tax (8.25%) | $1,423.29 | ||
| Total | $25,960.29 | ||
What a Roofing invoice needs on it
A roofing invoice should state the product installed and both warranty terms, because it is the document the homeowner needs to register a manufacturer warranty and the one an insurer will ask for after the next storm. Note the actual decking sheets used against the allowance so the final number reconciles line by line.
- The product actually installed, by name, for the manufacturer warranty registration
- Tear-off layers actually removed, where it differed from the count you quoted
- Both warranty terms and their start date, since this is the document an insurer asks for after a storm
- Permit and final inspection if the jurisdiction required one
- Deposit credited, balance due, and when payment is expected
And what every invoice needs
Send it the day the work is finished. Invoices sent within 24 hours get paid materially faster than ones that go out at the end of the month.
- A due date, not just terms — "Net 14" means less to a homeowner than a date
- Any deposit already paid, credited on the page so the balance is unarguable
- Payment instructions the customer can act on without calling you
- The estimate number it came from, so the customer can reconcile the two
Roofing line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Materials | ||
| Architectural shingles, supplied and installed | sq | $485.00 |
| Synthetic underlayment | sq | $58.00 |
| Ice-and-water shield, eaves and valleys | sq | $145.00 |
| Ridge vent, cut and install | ft | $18.50 |
| Pipe boot, replace | ea | $65.00 |
| Step and counter flashing, chimney | ea | $575.00 |
| Decking replacement, 1/2 in. OSB (beyond allowance) | sheet | $95.00 |
| Labor | ||
| Tear-off and disposal, first layer | sq | $115.00 |
| Tear-off, each additional layer | sq | $75.00 |
| Steep-pitch adder (8/12 and above) | sq | $85.00 |
| Dumpster, delivery, haul-off and magnet sweep | ea | $685.00 |
| Permit and inspection | ea | $225.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
Questions
- What should a roofing invoice say about the decking allowance?
- Reconcile it line by line: sheets included, sheets used, the rate, the difference. Roofing is the trade where the final number most often differs from the quoted one, and an invoice that shows the arithmetic turns that into a settled account instead of a phone call.
- Why does the product name matter on a roofing invoice?
- Because the homeowner needs it to register the manufacturer warranty, and because it is the document an insurer will ask for after the next storm. An invoice that says "architectural shingles" is worth less to them than one naming the product and the colour.
- When should a roofer invoice — at completion or after final inspection?
- At completion, with the inspection noted if one is pending. The roof is on and the customer is dry; the paperwork following behind should not hold up payment for finished work. State the balance and your terms, and record the warranty start date while you are there.
Build your Roofing invoice now
Opens with the Roofing line items already loaded. Everything stays in this browser.
Open the builder