Painting invoice template
An invoice is the request for payment once the work is done — the document that actually gets you paid. Download this one as a PDF or an Excel spreadsheet, or fill it in online: it comes preloaded with 12 painting line items you can edit, delete or price your own way, then export a PDF straight from the browser. Free, no signup, and nothing you type is uploaded anywhere.
Download the Painting invoice template
The same sample document in two formats. The PDF is what a finished invoice looks like; the spreadsheet has live formulas, so change a quantity or a rate and the totals follow.
No signup, no email, no watermark. Sample figures — edit everything. Opens in Excel, Numbers and Google Sheets.
See this invoice filled in, in the builder — the same sample, editable.
Your Company Name
InvoiceNo. INV-1001
Bill to
Client Name
456 Client Street · Their City, ST 00000
Date Sep 1, 2026
Due Sep 15, 2026
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Labor | |||
| Interior walls, two finish coats | 400 sq ft | $2.15 | $860.00 |
| Ceilings, flat white, two coats | 400 sq ft | $1.85 | $740.00 |
| Trim, doors and casing, brush and roll | 40 ft | $4.25 | $170.00 |
| Interior door, both faces and edges | 1 ea | $110.00 | $110.00 |
| Materials | |||
| Premium interior latex, eggshell | 5 gal | $68.00 | $340.00 |
| Exterior acrylic, satin | 5 gal | $82.00 | $410.00 |
| Stain-blocking primer | 5 gal | $55.00 | $275.00 |
| Masking, drop cloths and floor protection | 1 ea | $135.00 | $135.00 |
| Subtotal | $3,040.00 | ||
| Tax (8.25%) | $95.70 | ||
| Total | $3,135.70 | ||
What a Painting invoice needs on it
A painting invoice should record the product, color and sheen per surface. The customer will need it in two years for a touch-up, and being the contractor who wrote it down is a large part of why they call you instead of searching their email.
- Batch numbers for any custom-tinted colour, which a store cannot reproduce without them
- Coats actually applied, where it differed from what was quoted
- Any carpentry or substrate repair performed, priced against what you quoted as an allowance
- Surfaces completed, so the excluded ones are on the record as excluded
- Deposit credited, balance due, and your payment terms
And what every invoice needs
Send it the day the work is finished. Invoices sent within 24 hours get paid materially faster than ones that go out at the end of the month.
- A due date, not just terms — "Net 14" means less to a homeowner than a date
- Any deposit already paid, credited on the page so the balance is unarguable
- Payment instructions the customer can act on without calling you
- The estimate number it came from, so the customer can reconcile the two
Painting line items included in this template
These load into the builder ready to edit. Prices are starting points, not our opinion of what you should charge — set your own and they save to your price book.
| Item | Unit | Typical rate |
|---|---|---|
| Labor | ||
| Interior walls, two finish coats | sq ft | $2.15 |
| Ceilings, flat white, two coats | sq ft | $1.85 |
| Trim, doors and casing, brush and roll | ft | $4.25 |
| Interior door, both faces and edges | ea | $110.00 |
| Cabinet doors and frames, sprayed | ea | $145.00 |
| Exterior siding, prep and two coats | sq ft | $3.10 |
| Patch, sand, caulk and spot-prime | hr | $78.00 |
| Pressure wash and surface prep, exterior | ea | $425.00 |
| Materials | ||
| Premium interior latex, eggshell | gal | $68.00 |
| Exterior acrylic, satin | gal | $82.00 |
| Stain-blocking primer | gal | $55.00 |
| Masking, drop cloths and floor protection | ea | $135.00 |
Rates are illustrative US figures and vary widely by market. Price your own work.
Questions
- What should a painting invoice record about the paint?
- Product, colour and sheen, per surface. The customer will need it in two years for a touch-up, and being the contractor who wrote it down is a large part of why they call you instead of searching their email for a receipt they never kept.
- How do I invoice prep that turned out to be worse than quoted?
- Show the quoted allowance and the actual work beside it. Painting prep is the line that most often grows once the scraping starts, and an invoice that separates "quoted prep" from "additional repair found at fascia" reads as an account rather than a price rise.
- Should an invoice list the surfaces that were excluded?
- A short line is worth it. Recording what was painted implicitly records what was not, and on a job where closets or ceilings were left out by agreement, that line is what prevents a call three weeks later asking when you are coming back for them.
Build your Painting invoice now
Opens with the Painting line items already loaded. Everything stays in this browser.
Open the builder